Marine Access

Milford Kayak Launch

Milford, DE
January 2011
Download .PDFDownload .PDF
Project For
Contractor
Engineer
Owner
Delaware Department of Natural Resources and Environmental Control (DNREC)
Maximum Protected Height
Maximum Exposed Height
Maximum Sheet Length
Max Depth
Max Retained Height
Length
Project For
Wall Lengths
Number of Sites
Max Depth
Max Retained Height
Length

Features

  • Full Float Dock System
  • Recessed Loading Platform
  • Canoe Cradle
  • Aluminum Toe Rail
  • 2 and 3 Line Hand Rail

Shipping Details

Project Summary

Many municipalities are changing their boating access focus from motorized watercraft to non-motorized watercraft, as kayaking and canoeing have increased in popularity. Special design considerations need to be made when designing docks specifically for canoes or kayaks. The Delaware DNREC chose GatorDock® because of our in-house design experience with kayak and canoe launch systems. The full float system increased stability while providing a low freeboard for easy loading and unloading. This system features custom aluminum canoe cradles and handlebars as well as toe curb for user safety.

Products Used

Product Used

Contact Us