Marine Access

Wilmington Ferry Landing

Wilmington, DE
January 1990
Download .PDFDownload .PDF
Project For
Contractor
Engineer
Owner
City of Wilmington
Maximum Protected Height
Maximum Exposed Height
Maximum Sheet Length
Max Depth
Max Retained Height
Length
Project For
Wall Lengths
Number of Sites
Max Depth
Max Retained Height
Length

Features

  • Day Docking
  • 3600 sq. ft
  • Aluminum Gangways
  • Floating Dock System
  • IPE Hardwood Decking

Shipping Details

Project Summary

The public docks along the Christina River were pivotal to the all-access approach when redeveloping the Wilmington riverfront. This system sees high levels of traffic from rowers to river taxis to visiting tall ships. The alternating wood and aluminum features natural to GatorDock® construction transition seamlessly to the existing boardwalk. Additionally, a series of gangways with fixed/ floating landings ensure full ADA accessibility regardless of water level.

Products Used

Product Used

Contact Us